In our filming on Sunday the 13th the day ran very smoothly as we had no issues with time management as everyone was on time the weather was clear thus allowing us to film in our exterior locations. The mise-en-scene we kept the same from our previous filming in Brighton and the weather fortunatly was similar to that of our previous filming.

[Screen shot previous footage] [Screen shot new footage]

The problems we encountered were the battery life, the batterys died during our shoots however we did have a spare but also this battery died and therefore we were unable to get one of shopt ideas, however we got all of our other shots plus extra handi-cam footage.



[Screen shot of extra shot ideas]




Overall the day out was a success and we had our extra band member to come along aswell during the filming. Cameron, Jack and I all took turns when filming in order to make the handicam footage look more authentic. Predominatly I was camerman, Cameron was director of shoots and positioning, jack was incharge of camera equipment and helped with the directing of shoots and filming. We approached the graffitti shot differently this time and used a variety of camera angles and shot the same part over and over in order to acquire enough footage that we can cut between and cut back to.



[Screen shot of graffitti wall]


The way we approached filming this time was alot more systematic and we had managed our time more effectively for our shoots unlike last year were we had a few issues. Hopefully this will show in our final production as to the quality and effort put into the production of it.